CRP OS
CR
Edit Property
Update access instructions, property details, and notes.
Property Name
Client
Mountain Time
Russell
Address
Unit Number
City
State
ZIP
Property Type
Apartment
Condo
Townhome
Single Family
Multi-Family
Beds
Baths
Sq Ft
Access Instructions
I have a Key
Notes
1. JUNK REMOVAL - Remove all remaining items and debris located throughout the first floor. - Remove all remaining items and debris located throughout the basement. - Dispose of all discarded materials. - Prepare all interior areas for repair and cleaning crews. 2. LANDSCAPING Front Yard: - Heavy landscaping required. - Remove overgrown vegetation. - Weed removal and cleanup. - Debris removal. - Restore curb appeal. Back Yard: - Remove trash and debris. - General cleanup. - Weed control and vegetation management. - Assess additional landscaping needs after cleanup. 3. DEEP CLEANING Kitchen: - Deep clean stove and burners. - Deep clean oven. - Clean range hood. - Deep clean refrigerator and freezer. - Clean and sanitize all kitchen cabinets. - Clean countertops, backsplash, and sink. Bedrooms: - Sweep and mop floors. - Remove dust from walls and surfaces. - Clean baseboards, doors, and trim. - Remove cobwebs and accumulated dust. General Interior Cleaning: - Sweep and mop all flooring surfaces. - Clean walls throughout the property. - Clean doors, trim, and baseboards. - Clean vents and light fixtures. - Clean interior windows where necessary. - Sanitize bathrooms and common areas. 4. REPAIRS AND MAINTENANCE KITCHEN - Repair upper-left cabinet adjacent to stove. - Diagnose and repair two non-functioning stove burners. - Perform maintenance on kitchen range hood. - Repaint area above stove (4 ft wide x 3 in high). - Repaint wall section right of stove (10 in wide x 3.3 ft high). - Inspect kitchen ceiling lights ( it might need a new set of light bulbs). LAUNDRY ROOM - Clean or partially repaint affected wall area (4.4 ft x 2.8 ft). BEDROOM #1 - Replace two light bulbs. - Paint touch-ups or partial repaint. - Install two outlet covers. - Secure loose outlet. - Organize closet wiring. - Partial closet repaint. LIVING ROOM - Patch screw holes near the curtain area. - Install curtain rod stop/support. - Replace six light bulbs. - Paint touch-up near hallway entrance. MASTER BEDROOM - Paint touch-ups on all four walls. - Replace one light bulb. -light switches, quick maintenance (black take on top of it). PRIMARY BATHROOM - install baseboard the left side of the entry - Clean and repair wall above the doorway. (only leaning might be enough, pencil drawings where made) - Paint touch-ups near entrance. - Repaint lower bathroom cabinet section. - Reattach sink cabinet door. - Install toilet paper holder. HALL BATHROOM - Diagnose and repair non-functioning shower. - Paint touch-ups throughout bathroom. - Paint touch-ups behind toilet. BEDROOM #2 - Paint touch-ups on all four walls. - Replace two light bulbs. - Repair drywall hole (4 in x 3 in). - Reattach loose baseboard. BASEMENT STAIRS - Install three missing baseboards. - Paint touch-ups. - Optional nail removal, patching and repainting. BASEMENT - Organize exposed wiring. - Repair or remove unfinished wall infill ( it is falling apart). - Install covers on four window wells. UTILITY AREA - Inspect HVAC filter ( filter most be changed in a month or two, it is recommended to have a new one for new tenants) - Refill water softener salt. GARAGE - Repair left-side wall, Partial repaint. - Optional wood protection panel installation. BACKYARD - There’s an area that apparently was being used for Gardening that is falling apart; it has to be either removed or fixed, the cheapest option
Save Property
Cancel
Dashboard
Projects
Work Orders
More