CRP OS

CR

461 W 2110 S

461 W 2110 S, Heber City

Edit Property

Property Details

Mountain Time

Type

Single Family

Address

461 W 2110 S, Heber City, UT 84032

Beds / Baths

3 bed / 2 bath

Square Footage

1,470 sq ft

Access Instructions

I have a Key

Notes

1. JUNK REMOVAL - Remove all remaining items and debris located throughout the first floor. - Remove all remaining items and debris located throughout the basement. - Dispose of all discarded materials. - Prepare all interior areas for repair and cleaning crews. 2. LANDSCAPING Front Yard: - Heavy landscaping required. - Remove overgrown vegetation. - Weed removal and cleanup. - Debris removal. - Restore curb appeal. Back Yard: - Remove trash and debris. - General cleanup. - Weed control and vegetation management. - Assess additional landscaping needs after cleanup. 3. DEEP CLEANING Kitchen: - Deep clean stove and burners. - Deep clean oven. - Clean range hood. - Deep clean refrigerator and freezer. - Clean and sanitize all kitchen cabinets. - Clean countertops, backsplash, and sink. Bedrooms: - Sweep and mop floors. - Remove dust from walls and surfaces. - Clean baseboards, doors, and trim. - Remove cobwebs and accumulated dust. General Interior Cleaning: - Sweep and mop all flooring surfaces. - Clean walls throughout the property. - Clean doors, trim, and baseboards. - Clean vents and light fixtures. - Clean interior windows where necessary. - Sanitize bathrooms and common areas. 4. REPAIRS AND MAINTENANCE KITCHEN - Repair upper-left cabinet adjacent to stove. - Diagnose and repair two non-functioning stove burners. - Perform maintenance on kitchen range hood. - Repaint area above stove (4 ft wide x 3 in high). - Repaint wall section right of stove (10 in wide x 3.3 ft high). - Inspect kitchen ceiling lights ( it might need a new set of light bulbs). LAUNDRY ROOM - Clean or partially repaint affected wall area (4.4 ft x 2.8 ft). BEDROOM #1 - Replace two light bulbs. - Paint touch-ups or partial repaint. - Install two outlet covers. - Secure loose outlet. - Organize closet wiring. - Partial closet repaint. LIVING ROOM - Patch screw holes near the curtain area. - Install curtain rod stop/support. - Replace six light bulbs. - Paint touch-up near hallway entrance. MASTER BEDROOM - Paint touch-ups on all four walls. - Replace one light bulb. -light switches, quick maintenance (black take on top of it). PRIMARY BATHROOM - install baseboard the left side of the entry - Clean and repair wall above the doorway. (only leaning might be enough, pencil drawings where made) - Paint touch-ups near entrance. - Repaint lower bathroom cabinet section. - Reattach sink cabinet door. - Install toilet paper holder. HALL BATHROOM - Diagnose and repair non-functioning shower. - Paint touch-ups throughout bathroom. - Paint touch-ups behind toilet. BEDROOM #2 - Paint touch-ups on all four walls. - Replace two light bulbs. - Repair drywall hole (4 in x 3 in). - Reattach loose baseboard. BASEMENT STAIRS - Install three missing baseboards. - Paint touch-ups. - Optional nail removal, patching and repainting. BASEMENT - Organize exposed wiring. - Repair or remove unfinished wall infill ( it is falling apart). - Install covers on four window wells. UTILITY AREA - Inspect HVAC filter ( filter most be changed in a month or two, it is recommended to have a new one for new tenants) - Refill water softener salt. GARAGE - Repair left-side wall, Partial repaint. - Optional wood protection panel installation. BACKYARD - There’s an area that apparently was being used for Gardening that is falling apart; it has to be either removed or fixed, the cheapest option

Project History

Recent work associated with this property.

View All